Underground Steam and Condensate Line Replacement
Lock Haven University
Lock Haven, PA

Project consisted of complete removal and replacement of underground central plant steam and condensate lines. The new lines were installed in a pre-cast concrete trench system with a removable lid. The trench system will provide the university staff with an efficient method of steam and condensate line maintenance.

New Fire Protection Water Distribution System
Lock Haven University
Lock Haven, PA

This project consisted of the installation of water distribution piping to eight campus dormitory buildings for fire suppression purposes. Site utility work included the installation of new direct buried ductile iron water piping, fire hydrants, post indicator valves and appurtenances. Wet-tap connections were made to existing water mains. Piping was installed underground to a termination point within each building. Provisions were made inside each building for connection to each building’s future sprinkler system.

Memorial Stadium Renovation
City of Scranton School District
Scranton, PA

GJAI Consulting Engineers in conjunction with The Palumbo Group are providing site utility design to accommodate the facility wide renovation of Memorial Stadium. Site utility design for the project includes new sports lighting towers and extension of storm water and sanitary sewage piping.

Boiler House Addition
Mount Nittany Medical Center
State College, PA

The expansion of the central steam plant at Mount Nittany Medical Center required an extension of the existing gas service piping from the service main to the new boiler house addition. GJAI Consulting Engineers provided the design of the new utility piping.

East Wing Addition
Mount Nittany Medical Center
State College, PA

GJAI Consulting Engineers provide extensive site utility design for this new 44,000 square foot multi-use healthcare facility. Site work included relocation and extension of the existing water service, a new water service for the fire suppression system and a new sewage lift station. Site lighting and extension of the facility electrical system distribution was also included. All site utilities were designed for the future expansion of the facility to double its current size.