East Wing Addition
Mount Nittany Medical Center
State College, PA

The East Wing Addition at Mount Nittany Medical Center will house a new state of the art 12 bed intensive care unit, 14 bed same day surgery suite, cardiac rehabilitation center, executive offices, a multipurpose conference center and an employee fitness area. Construction for the new facility began in November of 2002. Completion is scheduled for January of 2004.

GJAI Consulting Engineers provided all HVAC, plumbing, electrical, medical gas and site utility design services for the new addition. The new design includes expansion of the hospital central high-pressure steam plant and emergency power systems. GJAI’s design incorporates new building systems with existing systems to provide a seamless transition for patients and hospital personnel alike.

This project is one of over 275 renovation and new construction design projects completed for Mount Nittany Medical Center by GJAI during our continuous 17-year relationship. Our long-standing relationship with Mount Nittany Medical Center demonstrates GJAI’s commitment to excellence in engineering design, owner satisfaction and cost effective facility planning.

[Click here for more info]

Emergency Department Renovation
Mount Nittany Medical Center
State College, PA

Project consisted of a 1,500 square foot building addition and a 4,500 square foot renovation in the existing emergency department. Renovation to the emergency department began in October of 2002. Completion is expected in October of 2003.

GJAI Consulting Engineers provided all HVAC, plumbing, electrical, medical gas, site utility and fire alarm design services for the department renovation. The design incorporates a new protective isolation room, expansion of treatment, triage, exam rooms and laboratory space.

GJAI incorporated a construction sequence into the systems design to allow the emergency department to remain in operation throughout construction.

[Click here for more info]


Operating Suite Addition and Renovation
Mount Nittany Medical Center
State College, PA

This project included the addition of one operating suite and the renovation and expansion of an existing suite. The project required that one operating suite remain in operation through the duration of construction.

GJAI Consulting Engineers provided all HVAC, plumbing, electrical, medical gas and fire protection design services for the project. The new design incorporates provisions for emergency power, upgrades to the existing medical gas infrastructure and energy recovery utilization in the new HVAC system.

Centre Medical Sciences Building
The Pennsylvania State University
State College, PA

The building was originally constructed as a shell building with mechanical and electrical systems that could be adapted to various sizes and types of users. As the project construction progressed, various tenants were added to the building requiring constant updating of documents and systems. The entire building was designed using CAD systems allowing simplified integration of changes to the contract documents to suit tenant fit out.

The 125,000 square foot medical office building houses various outpatient areas including surgical suites and a sports medicine physical therapy area. There are numerous physicians’ offices along with radiology and cardio-pulmonary areas and two laboratories.

[Click here for more info]



Cancer Treatment Center Expansion

Morristown Memorial Hospital
Morristown, NJ

This project included a 40,000 square feet addition and 20,000 square feet of renovation to the existing Carl G. Simon Cancer Center. The new addition will house medical offices, chemotherapy treatment rooms, a breast cancer center and a new state of the art linear accelerator. Construction is expected to start in June of 2003. Project completion is scheduled for the summer of 2004.

GJAI Consulting Engineers provided HVAC design services for this project. The new design incorporates extension of the hospital chilled water and steam systems, additional air-handling equipment to serve the new addition and process cooling to sensitive medical equipment in the new linear accelerator vault. The new HVAC design allowed for existing equipment to be reused providing substantial first cost savings to the owner.


Building #1 Outpatient Program

Erie VA Medical Center
Erie, PA

This project included a 10,000 square foot physical therapy department addition and a 10,000 square foot emergency department and medical office renovation.

GJAI Consulting Engineers provided all electrical systems design for the project, which included extension of the facility power distribution system to the new addition and upgrades of the existing power distribution system to the renovated space. New modern nurse call and paging systems were designed by GJAI along with the fire alarm system.



Rehabilitation Hospital Renovation
Health South Altoona Rehabilitation Hospital
Altoona, PA

GJAI provided HVAC, electrical and plumbing design services for a 21,000 square foot renovation and addition to the existing rehabilitation hospital. The renovation included a new gymnasium, hydrotherapy room, therapy rooms, medical offices and a new therapeutic indoor pool.

GJAI :: Portfolio :: Healthcare