McNichols Plaza Chiller Replacement
City of Scranton School District
Scranton, PA

The aging central chilled water system at McNichols Plaza was replaced and redesigned by GJAI to provide a more functional, operator friendly and energy efficient air conditioning system. Included in the design were a new centrifugal chiller, cooling tower, chilled water and condenser pumps and a state of the art control system.

Memorial Stadium Renovation
City of Scranton School District
Scranton, PA

GJAI consulting engineers teamed with The Palumbo Group to provide renovation services to the aging Memorial Stadium. Renovations to the playing field, track, grand stands, locker rooms, concession areas and press boxes will make Memorial Stadium one of the premier outdoor stadiums in Northeast PA. The multiphase constructions began in April 2003. Completion is scheduled for August 2004.

GJAI Consulting Engineers is providing all electrical, HVAC and plumbing design services for the facility. Included in the design is a new sports lighting system, audio system and water heating system. GJAI also served as a consultant for the various site utility designs.

West High Scranton High School Technology Wiring Upgrade
City of Scranton School District
Scranton, PA

This project at West Scranton High School will provide a new technology infrastructure to serve the students and faculty alike. Nine existing classrooms were renovated to provide new computer laboratories expanding the schools technology classroom capacity by over 500%.

GJAI Consulting engineers provided all electrical, HVAC and Fire Suppression systems design as well as technology consulting services.

Armstrong School No. 40 Boiler Replacement
City of Scranton School District
Scranton, PA

GJAI Consulting Engineers is providing all mechanical and electrical systems design to replace the central hot water heating system at Armstrong School No. 40. The design included replacement of the existing boilers with new cast iron sectional boilers. Capacity of the central system was increased to provide full system redundancy so no educational time would be lost due to boiler repairs for years to come. The project also included an upgrade to the automatic temperature control system.